Six procedures. The first three are oxygen work and they have their own discipline.
Procedure 0 — Oxygen cleanliness (R1, R4)
Before touching any oxygen component.
- Clean hands. No lotion, no sunscreen, no oil.
- Oxygen-clean tools and equipment only, kept separate and marked.
- No smoking, no ignition sources, no powered aircraft in the area.
- Correct materials only — seals, lubricants and tape approved for oxygen service.
- Confirm cylinders are within hydrostatic test date.
Check — name the last thing your hands touched. If it was a lubricant, a solvent-soaked rag or a sandwich, wash them (AF-G Concepts §2).
Procedure 1 — Purge an oxygen system (S2)
- Procedure 0.
- Follow the manual's purge procedure — typically flowing dry, oil-free oxygen or nitrogen through the system to remove moisture and contaminants.
- Purge at the specified rate for the specified time. Rate matters: rapid flow heats the gas.
- Confirm completion per the procedure.
Check — purging is specified because moisture in an oxygen system freezes at altitude and blocks it. If you are not following a written procedure with a rate and a duration, you are not purging.
Procedure 2 — Service an oxygen system (S3)
- Procedure 0.
- Confirm the correct gas — aviator's breathing oxygen, not medical, not welding. The specification differs in moisture content, and moisture is what freezes.
- Connect per the manual, bonded.
- Charge slowly. Rapid charging heats the gas by compression, which is both a fire risk and a cause of over-reading pressure.
- Charge to the pressure specified for the ambient temperature — cylinder pressure varies with temperature, and a cylinder filled hot is undercharged when cool.
- Leak check with an approved leak-detection method — not soap containing hydrocarbons.
- Record the servicing.
Check — charge slowly, and check pressure again when it has cooled. A cylinder that reads correct while warm will read low an hour later.
Failure — using the wrong gas grade, or charging fast. Both are invisible at the time.
Procedure 3 — Inspect oxygen components (S1, S4, S5, S6, S7)
Cylinders (S6): hydrostatic test date, external corrosion, dents, gouges, security of
mounting, valve condition, and any evidence of overheating.
Regulators (S5): security, correct pressure output, leakage, condition of gauges.
Masks and hoses (S4): cleanliness, hardening or cracking of hose, condition of the mask,
security of connections, and cleaning only with approved materials — many common cleaners
leave a hydrocarbon residue.
Chemical generators (S7): safety pin fitted, no evidence of initiation or heat, within
life, correctly secured, and handled with the pin in place at all times.
Check — the hydrostatic date is a hard limit. A cylinder out of date is unairworthy regardless of condition, and it is one of the time-based items no inspection can substitute for (AF-B Concepts §3).
Procedure 4 — Inspect an exhaust heat exchanger for cracks (S13)
Read AF-G Concepts §3 first. This is a carbon monoxide inspection.
- Remove the shroud so the exhaust component inside is accessible.
- Clean the surface so cracks are visible.
- Inspect welds, slip joints, and areas of stress concentration, with light and magnification (GEN-K Procedures Procedure 2).
- Where the manual requires, perform a pressure leak check of the exhaust system (PP-L).
- Inspect the shroud itself and its sealing.
- Any crack in an exhaust component within a heat shroud is a rejection. It is not a repairable-in-service item unless the manual explicitly says so.
Check — a visual inspection of the outside of a muffler proves very little. If the manual offers a pressure check, that is the inspection; visual is the screen.
Procedure 5 — Clean and inspect a pressurization outflow valve (S14)
- Depressurize and de-energize, and confirm.
- Remove per the manual, noting orientation and any rigging.
- Clean with approved materials; the valve is often fouled by cabin dust and contamination, and that is what makes it stick.
- Inspect seat and seal condition, diaphragm condition, filter or screen, and free movement through full travel.
- Reinstall, rig per the manual, and functionally check.
Check — check free movement through full travel by hand before reinstalling. A valve that sticks anywhere in its range produces intermittent pressurization faults that are attributed to the supply (AF-G Concepts §4).
Procedure 6 — Inspect a combustion heater and its fuel system (S10, R6)
- Inspect the fuel supply lines and connections for leaks — a fuel leak at a combustion heater is a fire in the airframe.
- Check the combustion air and ventilating air paths are clear and separate.
- Check overheat switches and safety devices — these are the protections and they are tested, not assumed.
- Inspect the combustion chamber per the manual for cracks, which would put combustion
products into the ventilating air — the same hazard as
S13. - Check drains clear.
Check — the overheat protection must be tested, not inspected. It is the device that stops a heater fire, and a switch that looks fine and does not function is worse than none.
The checks, collected
| Procedure | The check |
|---|---|
| Oxygen cleanliness | Name the last thing your hands touched |
| Purging | A written procedure with a rate and a duration |
| Servicing | Charge slowly; re-check pressure when cool |
| Component inspection | Hydrostatic date is a hard limit |
| Heat exchanger | Visual is the screen; pressure check is the inspection |
| Outflow valve | Free movement through full travel, by hand |
| Combustion heater | Test the overheat protection, do not inspect it |
License