Aircraft Electrical Systems
What to read
-
Concepts It is mostly about wire
8 sections
Sections of Concepts
- §1 Generation is six elements; wire is twelve
- §2 R8 — soldering, and the thing candidates get backwards
- §3 Nine risk elements, and four of them are one rule
- §4 S9 — the one place you size something
- §5 Shielding, bonding and lightning are one idea
- §6 Routing is where the delayed failures come from
- §7 What consumes this unit
- License
- Hands-on Terminating, worked over weeks 8 sections
-
Procedures Terminating, routing, protecting
10 sections
Sections of Procedures
- Proc. 0 De-energize, and know what is near you (R1–R4)
- Proc. 1 Determine the electrical load, and size the wire from it (S9, R6)
- Proc. 2 Strip and terminate (S2)
- Proc. 3 Splice (S2)
- Proc. 4 Assemble a connector (S3)
- Proc. 5 Solder, where it is called for (S5, R8, R9)
- Proc. 6 Route and secure a bundle (S8, R5)
- Proc. 7 Install a bonding jumper (S10)
- The checks, collected
- License
-
Quick reference Aircraft Electrical Systems
2 sections
Sections of Quick reference