Four procedures. The procedures in AF-M Procedures apply in full; this component covers what differs on the engine.
Procedure 0 — Safe the squib (R3)
Identical to AF-M Procedures Procedure 0, and it is not negotiable.
- De-energize.
- Disconnect the squib connector at the container.
- Cap or short it per the manual.
- Never apply an ohmmeter or a test set to a squib circuit unless the manual specifies the method and the instrument.
Check — point at the capped connector and say it aloud.
Procedure 1 — Inspect an engine fire detection system (S2–S4, S12, S14)
- Trace the loop or sensor routing against the installation drawing. A loop rerouted for convenience no longer covers the zone it was designed for (PP-E Concepts §2).
- Inspect the sensing element for chafe, kinks, crushing and corrosion — routed through a hot, vibrating compartment, this is where it fails.
- Inspect support clamps at the specified intervals.
- Check connectors and end fittings for security and corrosion.
- Inspect thermal switches, thermocouples and flame detectors where fitted.
- Look for heat damage to the element and its supports.
Check — compare the routing against the drawing, not against how you found it. Previous maintenance may have moved it.
Procedure 2 — Check detection system operation (S13, S5, S1)
- Press-to-test first, and understand it proved the lamp and the warning circuit (AF-M Concepts §4).
- Then perform the system operational check by the manual's method, which exercises detection itself.
- Confirm the warning appears and clears.
- Check any fault or short monitoring.
- Record which check you performed.
Check — write down which test you did. "Fire system checked" is ambiguous, and the ambiguity lets a dead loop be signed off.
Procedure 3 — Inspect the extinguishing system (S6–S8, S10, S11, S2)
- Procedure 0.
- Hydrostatic test date on the container — out of date is unairworthy regardless of condition.
- Cartridge date — cartridges have their own life.
- Pressure against the temperature chart, not the gauge alone (PP-E Concepts §3).
- Blowout plugs: thermal plug missing means an overheat discharge; discharge indicator missing means it was fired. Both are findings requiring investigation, not just replacement.
- Inspect container mounting, discharge lines and nozzles for security and obstruction.
- Inspect the discharge circuit wiring — by the manual's method only.
- Reconnect the squib last.
Check — a missing blowout plug is a question, not a part number. Find out why it went before fitting a new one.
The checks, collected
| Procedure | The check |
|---|---|
| Safe the squib | Point at the capped connector, say it aloud |
| Detection inspection | Compare routing against the drawing |
| Operational check | Write down which test you performed |
| Extinguishing system | A missing blowout plug is a question, not a part number |