Five procedures. Wiring technique is in AF-K Procedures and is not repeated here.
Procedure 0 — De-energize, in an engine bay (R2, R3)
- Master off, and disconnect the battery where the work touches starter or charging circuits. Those circuits carry hundreds of amps.
- Magnetos grounded (PP-H Procedure 0) — you are working near a propeller.
- Confirm dead at the point of work.
- Remove rings and watches, and use insulated tools.
Check — point at the disconnected battery lead. A master switch is not isolation for a starter circuit.
Procedure 1 — Inspect engine electrical wiring (S1, S8, S15, R4)
- Separation from fluid lines — and note anything routed below a fluid line (PP-F Concepts §1).
- Clamping: interval, condition, correct type, not over-tightened.
- Chafe: at clamps, at structure, at anything that moves. Note which way the chafe runs.
- Heat damage: hardened, cracked or discolored insulation, especially near exhaust.
- Fire sleeve present where required, and in good condition.
- Connectors: security, sealing, backshell condition, corrosion.
- Terminals: security, corrosion, correct type, and no more than the permitted number per stud.
Check — look above every wire run for a fluid line. That is the engine-bay specific inspection and it is the one that prevents fires.
Procedure 2 — Determine wire size for an engine circuit (S9, K8)
- Establish load current and duty.
- Establish run length, out and back.
- Select on current capacity and voltage drop, taking the larger (AF-K Procedures Procedure 1).
- Apply the temperature derating for engine-compartment ambient — this is the step that differs (PP-F Concepts §2).
- Apply bundle derating.
- Size the protective device to protect the wire, also derated.
Check — state the ambient temperature you sized for. A size chosen without it is a cabin size in a cowling.
Procedure 3 — Replace a generator or alternator (S3, S4)
- Procedure 0.
- Note belt or drive arrangement, mounting and any shims.
- Disconnect electrically, labeling and capping.
- Remove, supporting the unit.
- Confirm the replacement part number is eligible for this engine and installation
(
S2, GEN-I Procedures Procedure 5). - Install, torque per the manual, set belt tension where applicable to the specified figure.
- Reconnect, confirming polarity (PP-F Concepts §3).
- Functional check: output voltage at the specified RPM, and regulator function.
Check — confirm polarity before energizing, and state it aloud. This is the one failure in this curriculum that is immediate and expensive.
Procedure 4 — Troubleshoot a charging system (S5, S12)
- Predict: what should the system voltage be at what RPM (GEN-A Concepts §2)?
- Measure system voltage at the bus, engine running, at the specified RPM.
- If there is no output, check the field circuit first — breaker, switch, regulator supply, field wire. An alternator without field excitation produces nothing and is not faulty (PP-F Concepts §4).
- Check the ground — both the unit's ground and the engine bonding (
S13). - Voltage drop along the output cable under load (GEN-A Procedures Procedure 5).
- Then consider the unit itself.
- Use the wiring schematic throughout (
S12).
Check — say which of field, ground, cabling and unit you have eliminated. Replacing an alternator that had no field supply is the classic wasted repair here.
Procedure 5 — Remove and install a starter (S6, S7)
- Procedure 0 — battery disconnected.
- Note the drive arrangement and orientation.
- Disconnect the heavy cable, insulating the end, and any control leads.
- Remove, supporting the unit — starters are heavy.
- Install with correct hardware, confirm the drive engages correctly, torque per the manual.
- Reconnect, heavy cable last, correct polarity.
- Functional check, and check for correct disengagement after start.
Check — confirm the drive disengages. A starter that stays engaged after the engine fires is destroyed within seconds, and it takes the ring gear with it.
The checks, collected
| Procedure | The check |
|---|---|
| De-energize | Point at the disconnected battery lead |
| Wiring inspection | Look above every run for a fluid line |
| Wire sizing | State the ambient temperature you sized for |
| Generator R&I | Confirm polarity aloud before energizing |
| Charging faults | Say what you eliminated — field first |
| Starter | Confirm the drive disengages |